I.PELED
ARCHITECTS
PROJECTS
LIST
Our studio specializes in the architectural planning of projects for a wide range of public entities, including some of the largest and most influential in the economy.
Our expertise is in complex, system-intensive structures and buildings, including projects of vital importance to the nation.
We have a wealth of experience in designing healthcare facilities and laboratories, cultural and educational institutions, industrial and commercial complexes, urban planning and design, and large-scale projects in the private sector, including mixed-use facilities, among other things.
With a portfolio spanning both national and international locations, we are committed to upholding the highest standards of design, professionalism, and client service in every engagement.

Ministry of Health and Barzilai Medical Center, Ashkelon
Year | Project Description | Size | Status |
---|---|---|---|
2022-Present | Department and Institute of Urology | 2,200 m² | Ongoing |
2021 | MRI Complex | 250 m² | Completed |
2019-2021 | Surgical Department | 2,200 m² | Completed |
2012-2021 | Renovation and Expansion of the Delivery Room Wing in Stages:
Stage 1 – Expansion of delivery rooms and addition of a lobby and husbands’ corridor (2012).
Stage 2 – Addition of a rocket-proof, sheltered wing (2015).
Stage 3 – Renovation of the delivery rooms (2020).
Stage 4 – Addition of an administrative wing and a new waiting area (2021). | 1,400 m² | Completed |
2019 | Feasibility Study for the Construction of a New Wing in Medical Center | 17,500 m² | Completed |
2019 | Feasibility Study for the Addition of an Auditorium and Conference Center on the Roof of the Surgery Building | 1,500 m² | Completed |
2013 | Feasibility Study for Women's Health Wing | 1,200 m² | |
2013 | Feasibility Study for the Neonatal N.I.C.U. | 1,200 m² | |
2010-2019 | Surgical Building in a rocket-proof shell.
Including 300-bed emergency hospital, medical center, operating wing, intensive care units (respiratory and pediatric), hospitalization wards, sterile supplies, imaging center, pediatric wing, and power center. | 39,000 m² | Completed |
2015-2018 | Rehabilitation Center
Including inpatient department, cardiac rehabilitation fitness center, physiotherapy center, occupational therapy center and a therapeutic pool. | 5,800 m² | Completed |
2008-2013 | Obstetrics and Gynecology Ward | 2,000 m² | Completed |
2011 | MRI and Ultrasound Complex | 750 m² | Completed |
2005-2007 | Internal Medicine Ward | 900 m² | Completed |
2004-2005 | Geriatric Ward | 900 m² | Completed |
2000-2004 | Pathology Institute
New Building, Phase 1: cold room and autopsy room, and preparations for a pathology laboratory floor. Together with David Anatol Brutzkus. | 250 m² | Completed |
1998-2000 | Master Plan for Barzilai Medical Center | 250,000 m² | Completed |
1998-2000 | Maternity and Neonatal Unit | 1,600 m² | Completed |
1998-1999 | Catheterization Labs for Procedures and Treatments Related to Rhythm Disorders | 700 m² | Completed |
1998-1999 | District Health Bureau
Together with David Anatol Brutzkus. | 1,500 m² | Completed |
1997-1999 | Maternity Ward | 2,000 m² | Completed |
2000-Present | Support for Construction Projects Throughout the Hospital, including Design, Supervision, and Updates to the Master Plan. | Ongoing | |
1993-1998 | Hospital Building, including Energy Center
Together with Spector Amisar Architects | 10,346 m² | Completed |
1997 | Central Storage Area
Together with David Anatol Brutzkus. | 1,000 m² | Tender Documents Completed |
1996-1997 | Technical Services Complex and Hospital Workshops.
Together with David Anatol Brutzkus | 1,200 m² | Completed |
Ministry of Foreign Affairs
Year | Project Description | Size | Status |
---|---|---|---|
2025- Present | Israeli Embassy in Luanda, Angola | 600 m² | In Design |
2024- Present | Israeli Embassy in Ottawa, Canada | 650 m² | In Design |
2019-2024 | Israeli Consulate Building in New York, USA | 3,660 m² | Completed |
2017-2019 | Israeli Embassy in Ankara, Turkey | 1,750 m² | Completed |
2015 | Israeli Embassy in Vienna, Austria | 1,000 m² | On Hold |
2014-2015 | Israeli Consulate in Munich, Germany | 950 m² | Completed |
2010-2011 | Israeli Consulate in Chicago, USA | 570 m² | Completed |
2005-2007 | Cancer Diagnosis Center in Mauritania | 2,200 m² | Completed |
2005-2006 | Ambassador’s Residence in Pretoria, South Africa | 430 m² | Design stage completed |
Israel Railways
Year | Project Description | Size | Status |
---|---|---|---|
2018- Present | Rehovot Station Expansion
Including new platform, passenger bridge, shelters, extension of existing platforms, and infrastructure improvements. | 10,500 m² | In Construction |
2021-2025 | Expansion and Renovation of Rehovot Station Southern Terminal | 340 m² | Completed |
2016-2023 | Expansion and Renovation of Rehovot Station Northern Terminal | 7,900 m² | Completed |
Jerusalem Development Authority
Year | Project Description | Size | Status |
---|---|---|---|
2020- Present | Kiryat Menachem and Dahomey St. 4–6 Urban Renewal Plan
Including 650 units and commercial center. | 18,500 m² | On Hold |
2008-2016 | Master Plan for Southwest Jerusalem
Urban renewal, covering 1,600 acres, in cooperation with the Housing Ministry, Interior Ministry, Israel Lands Authority, and Jerusalem Municipality. | 1,600 acres | Completed |
2008-2012 | Master Plan for the Givat Shaul Industrial Zone | 150 acres | Completed |
2010 | Urban Development Plan for Givat Shaul D – Industrial Zone | 158,000 m² | On Hold |
Jerusalem Municipality
Year | Project Description | Size | Status |
---|---|---|---|
2004-2007 2017 | Daycare Center and Two Synagogues in Har Homa. | 2,200 m² | Completed |
2005-2013 | Youth Center and Community Center in Givat Masua. | 1,000 m² | Completed |
2005-2013 | Masuat Shalom Synagogue, Givat Masuah | 400 m² | Completed |
2009 | Experimental School
Development of a Program and Preliminary Planning, through the Eden Company and the Education Ministry. | 3,000 m² and sports complex | On Hold |
1995-1997 | Development of Gonenim Neighborhoods, plans for landscaping and parcelization. | Conceptual Plan Completed | |
1993 2009-2010 | Rehabilitation of the Olsvanger-Brazil Neighborhood.
Renovation of 620 existing units and addition of 800 new units. | Conceptual Plan Completed |
Moriah Jerusalem Development Corporation
Year | Project Description | Size | Status |
---|---|---|---|
2020-Present | A-Sheikh Elementary School.
Twenty-four classroom elementary school with sports center and public library. | 6,160 m² | In Design |
2020 -Present | Ali Hijazi Kindergarten.
Complex with six kindergartens and a daycare center. | 1,210 m² | In Design |
2020-Present | Abu Rabiah Kindergarten.
Complex with four kindergartens. | 512 m² | In Design |
2020-Present | Tzur Baher Kindergarten. Complex with four kindergartens. | 512 m² | In Design |
2015-2018 | Kiryat Menachem Commercial Center
Renovation of commercial center and 180 residential units | 4,000 m² | On Hold |
2013-2017 | Tahun Street Demolition and Renewal (Pinui Binui) of Apartments.
Plan includes 710 units, the reconstruction and widening of the street to include a light rail line, and the addition of commercial and public space. | 3.8 acres, 110,000 m² of built space, including 610 apartments | Completed |
Africa Israel Investments Ltd./B.S.R. Group/Electra Group
Year | Project Description | Size | Status |
---|---|---|---|
2017-Present | Rager Boulevard, Beer Sheva.
Mixed-use urban renewal project containing 950 new residential units, office and commercial space, and an urban square. | 8 acres | Approved |
Bayit Yerushalmi
Year | Project Description | Size | Status |
---|---|---|---|
2017-Present | Life Center, Har Homa
Detailed plan for a mixed-use building containing 4,000 m2 of commercial space, 3,000 m2 of offices, 1,200 m2 of public space and 150 residential units. In collaboration with PRUS Architects | 20,000 m² | In Design |
Herzliya Municipality
Year | Project Description | Size | Status |
---|---|---|---|
2016-2018 | Bar Ilan Elementary School
Renovation and expansion of the school from twelve to eighteen classrooms, with additional kindergarten facilities and a sports hall. | 4,800 m² | Completed |
Clalit Health Services
Year | Project Description | Size | Status |
---|---|---|---|
2018-2024 | Brazil St. Clinic, Jerusalem
A complete renovation of the existing facility to replace the existing mental health clinic with a community clinic. | 840 m² | Planning Completed, Construction On Hold |
2016-2018 | Hephzibah Clinic, Beit Shemesh
Design of a new community clinic. | 608 m² | Completed |
2011-2012 | Meir Medical Center IVF Department
Including operating rooms and laboratories | 600 m² | Completed |
Hazera Seeds
Year | Project Description | Size | Status |
---|---|---|---|
2011-2015 | Hazera Campus
Farm and support buildings, production facilities and phytopathology laboratories. | 1,400 m² | Completed |
2010-2015 | Cultivation Department Building
Offices and laboratories for chemistry, biology and genetic engineering. | 5,000 m² | Completed |
2010-2015 | Quality Assurance Laboratory | 600 m² | Completed |
The Hebrew University of Jerusalem
Year | Project Description | Size | Status |
---|---|---|---|
2006-2008 | Faculty of Dental Medicine
Two-story addition, including lecture hall, seminar rooms and clinic. | 1,200 m² | Completed |
2003-2006 | Faculty of Sciences | Completed | |
Institute of Chemistry laboratories, | 450 m² | ||
Institute of Applied Physics laboratories (Including a sterile room and climate chamber), | 160 m² | ||
and stem cell research laboratory. | 250 m² | ||
2002 | Faculty of Medicine
Laboratory for Institute of Biochemistry, Food Science and Nutrition. | 400 m² | Completed |
1998-1999 | Faculty of Dental Medicine
General renovation and reorganization of the facility: | Completed | |
Student clinics and orthodontic clinic | 1,000 m² | ||
Specialist clinics and reorganization of the entrance level. | 2,000 m² | ||
1996-1997 | Maiersdorf Faculty Club, Mount Scopus Campus.
Professional, social and cultural meeting space for the university community. Renovation and reorganization of the entire building. | 4,000 m² | Completed |
The Hadassah University Hospital - Ein Kerem
Year | Project Description | Size | Status |
---|---|---|---|
2011-2015 | GMP Facility of the Gene Therapy Institute. | 400 m² | Completed |
2011 | Radiotherapy Unit in the Sharett Institute of Oncology. | 2,500 m² | Preliminary Design Completed |
2005-2007 | Sharett Institute of Oncology Day Care | 800 m² | Completed |
2004-2007 | Day Care for Gastroenterology, Internal Medicine, and Surgery. | 2,500 m² | Completed |
2001-2003 | Hematology Department | 1,250 m² | Completed |
2002 | Radiotherapy Unit of the Sharett Institute of Oncology.
Renovation, together with Spector Amisar Architects. | 600 m² | Completed |
2001-2002 | Central Hospital Building
Reorganization, renovation and expansion, together with Spector Amisar Architects. | 10,000 m² | Design Development Completed |
2001-2002 | New Entrance and Atrium
Including reorganization of the various reception offices and the hospital’s movement plan, together with Spector Amisar Architects. | 3,200 m² | Design Development Completed |
2000-2002 | Sharett Institute of Oncology | 1,250 m² | Completed |
2000-2001 | IVF Clinic | 400 m² | Completed |
2001 | MRI Unit
Expansion and introduction of an additional machine | 300 m² | Completed |
1999-2001 | Liver Disease Unit
Clinical laboratories, research department and clinic, together with Spector Amisar Architects. | 1,000 m² | Completed |
1999-2001 | Private Inpatient Department
Together with Spector Amisar Architects | 1,000 m² | Completed |
2000 | Department of Cardiothoracic Surgery Intensive Care | 300 m² | Completed |
2000 | Department of Nuclear Medicine
Laboratories, PET, research lab, P3 room and gamma scanner examination room, together with Spector Amisar Architects. | 1,200 m² | Completed |
1999-2000 | Institute of Pulmonology
Research, clinic, and treatment, together with Spector Amisar Architects. | 800 m² | Completed |
1998 | Radiotherapy Unit of the Sharett Institute of Oncology.
Accelerator rooms and simulator, together with Spector Amisar Architects. | 600 m² | Completed |
1996-1997 | Cyclotron Facility
Including laboratory and GMP pharmaceutical ingredient production.
| 1,700 m² | Completed |
2009-2010 | Addition of cyclotron unit and radioactive iodine labs. | ||
1994-1995 | Institute for Human Biology Research
Laboratories and offices | 1,500 m² | Completed |
The Hadassah University Hospital - Mount Scopus
Year | Project Description | Size | Status |
---|---|---|---|
2005-2006 | Therapeutic Pool | 250 m² | Completed |
2005 | Department of Orthopedics Surgery
Reorganization and renovation. | 600 m² | Completed |
2005 | Hospice Care
Renovation | 300 m² | Completed |
2004 | Day Care Department
Reorganization and renovation | 400 m² | Completed |
Herzliya Medical Center Hospital
Year | Project Description | Size | Status |
---|---|---|---|
2007 | Catheterization Center | 250 m² | Completed |
Dan Recycling Authority
Year | Project Description | Size | Status |
---|---|---|---|
2006-2008 | Laboratory for Wastewater Testing at the Shafdan Plant | 200 m² | Completed |
2007 | Laboratory for Wastewater Testing at Reading Pumping Station | 300 m² | Completed |
Silicon Graphics Biomedial Ltd.
Year | Project Description | Size | Status |
---|---|---|---|
1995 | Israel Headquarters in Jerusalem | 500 m² | Completed |
Ministry of Construction and Housing
Year | Project Description | Size | Status |
---|---|---|---|
2021-Present | Redevelopment of Petri Complex, Neve Yaakov
10 acres, including 450 residential units, commerce, industrial, and public buildings. | 10 acres | Approved |
2021-Present | Pisgat Zeev Infill
7.5 acre plan including 230 units and a park. | 7.5 acres | In Design |
2003 | Daycare Center, Har Homa. | 500 m² | Completed |
1998 | Master Plan for Maale Adumim Central Basin
Including an educational center, residential area, and a park. | 62 acres | Completed |
Government Urban Renewal Authority
Year | Project Description | Size | Status |
---|---|---|---|
2019-2022 | Holom Yoseftal-Hamelacha Boulevard - High Passenger Transportation System | 495 acres, 9,000 units, 6,000 m² commercial | Completed |
2014-2022 | Be’er Sheva Neighborhood C Urban Renewal Plan | 570 acres, 26,000 units | Completed |
2019-2020 | Tirat Carmel - The Bell Complex | Completed |
Israel Academy of Sciences and Humanities
Year | Project Description | Size | Status |
---|---|---|---|
2000-2001 | General renovation of the Building | 1,200 m² | Completed |
The Center for Educational Technology
Year | Project Description | Size | Status |
---|---|---|---|
2005 | Resource Center for the Upper Division, “Makif A”, Ashdod | 500 m² | Completed |
2000-2005 | Consultant for the Tikva Fund on a foreign exchange resource center. | ||
1995 | Ramat Sharet Elementary School Resource Center | 170 m² | Completed |
Herzog Medical Center
Year | Project Description | Size | Status |
---|---|---|---|
1991-1992 | Master Plan for Expansion of the Medical Center
Together with Spector Amisar Architects | 8,000 m² | Completed |
1991 | Geriatric Day Care, Physiotherapy and Occupational Therapy
Together with Spector Amisar Architects | 1,200 m² | Completed |
1990 | Division of Geriatrics | 900 m² | Completed |
YMCA Jerusalem
Year | Project Description | Size | Status |
---|---|---|---|
1994-1995 | Three Arches Hotel
Renovation, together with Spector Amisar Architects | 1,200 m² | Completed |
1992 | Sports Center Locker Rooms
Renovation, together with Spector Amisar Architects | 700 m² | Completed |
In addition to the diverse projects in the health, public, residential, and urban sectors, the office collaborates with various government bodies, designing hundreds of thousands of square meters of national infrastructure projects.
We specialize in complex, system-intensive structures and buildings, including projects of vital importance to the nation.
We are experienced in planning and supervising construction, as well as cooperating with other offices in Israel and around the world.